Anhui FUTEN Environmental Protection Co.,Ltd.

Anhui FUTEN Environmental Protection Co.,Ltd.

Manufacturer from China
Active Member
7 Years
Home / Products / Lift Station Pump /

Durable Lift Station Pump Wastewater Pump Station Long Service Life

Contact Now
Anhui FUTEN Environmental Protection Co.,Ltd.
City:hefei
Province/State:anhui
Country/Region:china
Contact Person:MissZou
Contact Now

Durable Lift Station Pump Wastewater Pump Station Long Service Life

Ask Latest Price
Brand Name :FUTEN
Place of Origin :HEFEI, ANHUI
MOQ :1 UNIT
Delivery Time :15 work days
Price :Negotiable
Material :Fiberglass, Stainless steel
Color :Customized
Application :Sewage Treatment
After-sales Service :Video technical support, Free spare parts, Online support
Certification :ISO9001/ISO14001/OHSAS18001/CE
Size :Customized
Capacity :0 ~ 60000 m3 / d (single tube)
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Drainage Integrated pumping station Best Selling Integrated Prefabricated Pumping Station for Waste Water Treatment

The integrated prefabricated pumping station is a new type of buried sewage and rainwater automatic collection and lifting equipment.

It has the advantages of convenient installation, less floor space and less construction work.

It is the best substitute for traditional concrete pumping station. Prefabricated GRP fiberglass wellhole or SUS304 stainless steel wellhole

and accessories manufactured by FUTEN Environmental Protection High Standard, matched with high quality water pump and control system, guarantee the reliability of the whole system to the utmost, and greatly simplify the installation and maintenance work.

It is suitable for collecting and discharging rainwater, sewage, wastewater, etc. in municipal, residential quarters, restaurants, schools, factories, military camps and other public places. It is mainly installed outdoors and underground, and can also be used indoors.

Product details

Integrated prefabricated pumping station are used to move wastewater to higher elevations in order allow transport by gravity flow. Sewage is fed into and stored in a sealed underground pit, commonly known as a wet well. When the level rises to a predetermined point, a pump will be started to lift the sewage upward through a pressurized pipe system from where it is discharged into a gravity manhole again. From here the cycle starts all over again until the sewage reaches its point of destination – usually a treatment plant.

Working Principle

Sewage is fed into and stored in a sealed underground pit, commonly known as a wet well. When the level rises to a predetermined point, a pump will be started to lift the sewage upward through a pressurized pipe system from where it is discharged into a gravity manhole again.

Strengths
1 Filament winding fiberglass equipment subject structure, its strength is equal to the traditional laminated glass fiber reinforced plastic double, can completely resist tearing, corrosion and other damage, reason its strong, lasting and durable. The cylinder of pumping station is made of fiberglass reinforced plastics. The internal fittings are made of SUS304 and hot-dip galvanized anti corrosive materials. No maintenance is required and the normal service life can reach more than 20 years.The buried structure makes it integrated with the surrounding environment, beautiful and generous.
2 The effective volume of cylinder of integrated prefabricated pump station for urban drainage is limited, generally 1/4 of maximum pump capacity. The requirement for stability of control system is very high as the sewage just stays temporarily in the cylinder. Huge safety hazard will be caused once the system breaks down.Our company develops the most advanced dual PLC control mode mainly to automatically switch to standby PLC system for control if main PLC system breaks down. This greatly improves stability of equipment.
3 Solenoid valve is installed at the opening of outlet line of submersible sewage pump, and the line is introduced into the cylinder bottom. It will automatically run for 1min whenever the submersible sewage pump is started to suspend the silt at the bottom in water. This enables the submersible sewage pump to transport the silt to sewage pipe network.
4 The density of some garbage in the fiberglass reinforced plastic cylinder is less than that of water. It floats on the water after entering the cylinder and accumulates if not timely cleared, which affects effective volume of the cylinder and stability of equipment. The stop signal of submersible sewage pump will drop to an ultralow liquid level to stop the pump and the floatage will be transported to the sewage pipe network when the floatage piles up to a certain height.

Durable Lift Station Pump Wastewater Pump Station Long Service LifeDurable Lift Station Pump Wastewater Pump Station Long Service LifeDurable Lift Station Pump Wastewater Pump Station Long Service LifeDurable Lift Station Pump Wastewater Pump Station Long Service Life

Inquiry Cart 0